Meridian Pi develops modular behind-the-meter hydrogen power systems for AI compute facilities, critical infrastructure, and industrial campuses in Washington. If you have an offtake commitment, we have the rest -- site to energization.
Washington State hosts a significant concentration of hyperscale data center infrastructure in the Columbia River corridor, driven historically by access to low-cost hydropower. As that capacity tightens and new large load applications encounter queue delays, behind-the-meter hydrogen provides an alternative path to energization.
Washington's strong clean energy policy environment, significant military presence at Joint Base Lewis-McChord and Naval facilities, and substantial remote industrial activity in forestry and mining create demand across multiple Meridian Pi market verticals.
Stackable capacity that scales with your deployment. Initial energization targeted in under six months on qualified sites.
Atmospheric hydrogen generation, fuel cell dispatch, and 30+ days of autonomous endurance. No interconnection queue.
1-100 Gbps dedicated high-speed fiber delivered alongside power as a single integrated deployment.
§45V, §48E, §48C, §45Q, and §6418 transferable credits structured into project financing on every eligible project.
Meridian Pi handles site qualification, engineering, permitting, procurement, construction, commissioning, and O&M.
One offtake commitment from you. We handle everything else. Site, finance, build, operate.
The Columbia River corridor and Puget Sound region host major hyperscale operators. As hydropower capacity tightens, BTM hydrogen provides an alternative to the utility interconnection queue.
Joint Base Lewis-McChord, Naval Base Kitsap, and Fairchild AFB represent significant defense infrastructure with energy resilience requirements.
Washington's remote forestry and industrial operations benefit from atmospheric hydrogen generation where grid access is limited or seasonal.
Washington state agencies and public utilities with clean energy commitments benefit from behind-the-meter hydrogen and verified carbon-neutral credentials.
Meridian Pi structures the full stack of available IRA tax credits on qualifying Washington projects. Credits are transferable under §6418 for direct cash value without a traditional tax equity structure.
Credit availability and amounts depend on project-specific facts, system configuration, and IRS guidance. Coordinate qualified tax counsel before relying on specific figures.
Share your facility type, power requirements, location, and target energization date. We evaluate every project individually and respond within two business days.
Qualify Your Site See how it works