Technology Financing Markets How It Works Talk to Us

Behind-the-meter hydrogen power in Arizona.

Meridian Pi develops modular behind-the-meter hydrogen power systems for AI compute facilities, critical infrastructure, and industrial campuses in Arizona. If you have an offtake commitment, we have the rest -- site to energization.

Arizona Market Context

Why behind-the-meter power matters in Arizona.

Arizona has become a major destination for data center investment, semiconductor manufacturing, and AI infrastructure, driven by land availability, business-friendly policy, and a large labor market. APS and SRP transmission capacity is under increasing pressure from the volume of large load applications.

Arizona's exceptional solar resource -- among the highest in the country -- makes it an ideal environment for solar-paired hydrogen generation. Behind-the-meter hydrogen systems in Arizona can maximize solar input to the electrolyzer, reducing the atmospheric extraction load and optimizing production economics.

1-24 MW Modular Units

Stackable capacity that scales with your deployment. Initial energization targeted in under six months on qualified sites.

No Grid Required

Atmospheric hydrogen generation, fuel cell dispatch, and 30+ days of autonomous endurance. No interconnection queue.

Gigabit Fiber Included

1-100 Gbps dedicated high-speed fiber delivered alongside power as a single integrated deployment.

Full IRA Credit Stack

§45V, §48E, §48C, §45Q, and §6418 transferable credits structured into project financing on every eligible project.

EPC In-House

Meridian Pi handles site qualification, engineering, permitting, procurement, construction, commissioning, and O&M.

Bring Your Load

One offtake commitment from you. We handle everything else. Site, finance, build, operate.

No grid. No fuel trucks.
Power from the air in Arizona.
Markets We Serve in Arizona

Who we work with.

AI
AI & Data Centers

Phoenix and Chandler data center corridors are among the fastest-growing in the Southwest. BTM hydrogen enables deployment on competitive timelines without utility queue delays.

SEMI
Semiconductor & Advanced Manufacturing

Arizona's semiconductor manufacturing expansion requires reliable, high-quality power at industrial scale. On-site hydrogen generation eliminates grid dependency and demand charge exposure.

MIL
Military & Defense

Luke Air Force Base and Fort Huachuca represent significant defense infrastructure with resilience requirements that benefit from islanded hydrogen microgrid operation.

REM
Remote & Industrial

Arizona's remote mining, agricultural, and industrial sites benefit from atmospheric hydrogen generation where grid extension is impractical.

Project Financing

IRA tax credits available on Arizona projects.

Meridian Pi structures the full stack of available IRA tax credits on qualifying Arizona projects. Credits are transferable under §6418 for direct cash value without a traditional tax equity structure.

§45V
Clean Hydrogen Production
§48E
Clean Electricity ITC
§48C
Advanced Energy Credit
§45Q
Carbon Capture Credit
§6418
Transferable Credits

Credit availability and amounts depend on project-specific facts, system configuration, and IRS guidance. Coordinate qualified tax counsel before relying on specific figures.

Get Started in Arizona

Ready to qualify your Arizona site?

Share your facility type, power requirements, location, and target energization date. We evaluate every project individually and respond within two business days.

Qualify Your Site See how it works